Approvals Online Query

Online Query Video Tutorial Data Center >> Company >>
Approvals Online Query (multiregional data)
Alternate Compliance, Departures and Time Extension Approvals
data last updated: 09-08-2024 03:00 AM(CST)

The following table lists alternate compliance, departures and time extensions BSEE has approved since June 15, 2020. Approval information will be added to this table within 15 days of the approval and the data will be refreshed weekly, on Sundays.

Alternate compliance means any alternate procedures or equipment that an operator proposes to use which provides a level of safety and environmental protection that equals or surpasses current BSEE requirements. Departures mean approvals granted by the appropriate BSEE or BOEM representative for operating requirements/procedures other than those specified in the regulations.

Query Options
v
v
v
v
from
xv
to
xv
Submit Query
 
Clear Query
 
Reset Grid Layout

Data Grid
Populate the Data Grid when no Query Options are chosen? 
Show Column Chooser Window
Hide All Columns
PDF
XLS
XLSX
RTF
CSV
Page 1 of 1224 (24477 items)Prev[1]234567122212231224Next v
x
Drag a column header here to group by that column
# 
Business Process 
Approval Type 
Approval Date Descending
Regulation Number 
WCR Regulation 
Region 
Company Number 
Company Name 
Description 
Attr Label 1 
Attr Value 1 
Attr Label 2 
Attr Value 2 
Attr Label 3 
Attr Value 3 
Attr Label 4 
Attr Value 4 
Attr Label 5 
Attr Value 5 
 
Open filter row popup menu
Open filter row popup menu
xv
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
 FSS PermitTime Extension9/7/202430 CFR 250.520NGulf of Mexico02481BP Exploration & Production Inc.Time Extension for Casing Pressure MonitoringComplex ID1001Area CodeMCBlock Number 474Facility NameMC 474 - A(Na Kika)  
 Measurement VerificationTime Extension9/6/202430 CFR 250.1202(d)(3)NGulf of Mexico03407Array Petroleum, LLCLiquid Hydrocarbon Royalty Meter ProvingsFMP No. (Required)20177082600Extension Month (MM/YYYY)08/2024Location (AA 0BBB P)SM 0099 AMeter DataLACT Meters, Serial Num. DF153082 and XCZ90244  
 New WellAlternate Compliance9/6/202430 CFR 250.737(c) Gulf of Mexico00689Shell Offshore Inc.Digital BOP testing LeaseG33166Area/BlockMC 612Rig ID50160Well NameDV001API Well Number608174150800
 APM ABANDONAlternate Compliance9/6/202430 CFR 250.1715(a)(8) Gulf of Mexico02481BP Exploration & Production Inc.Request to set 450' surface cement plug ~762' below the mudlineLeaseG15607Area/BlockGC 743Rig ID50380Well NameDC103API Well Number608114055400
 APM ABANDONAlternate Compliance9/6/202430 CFR 250.1715(a)(3) Gulf of Mexico02481BP Exploration & Production Inc.Isolate the perforated interval by setting a casing CIBP at 20,365'MD/18,033'TVD with 700' cement plug on top of the plug.LeaseG15607Area/BlockGC 743Rig ID50380Well NameDC103API Well Number608114055400
 APM ABANDONAlternate Compliance9/6/202430 CFR 250.1716(a) Gulf of Mexico02481BP Exploration & Production Inc.The wellhead will be left in place and a ROV survey will be conducted in accordance with 30 CFR 250.1742 to verify site clearance. Trawling will not be performed.LeaseG15607Area/BlockGC 743Rig ID50380Well NameDC103API Well Number608114055400
 APM ABANDONAlternate Compliance9/6/202430 CFR 250.1703(b) Gulf of Mexico02481BP Exploration & Production Inc.The final mechanical barrier (cast iron bridge plug) will be set in the 16-in liner, approximately 200-ft below the liner top, rather than in the 22-in surface casing. A 650-ft cement plug will be placed on the cast iron bridge plug with the top of cement planned for a depth of 8,150-ft. This will leave ~420-ft of cement above the 16-in liner top. In addition, the final surface cement plug (300-ftLeaseG15607Area/BlockGC 743Rig ID50380Well NameDC103API Well Number608114055400
 APM ABANDONAlternate Compliance9/6/202430 CFR 250.737(d)(10) Gulf of Mexico02481BP Exploration & Production Inc.The BOP will be function tested before running the Spanner Joint / recovering the upper completion. When the Spanner Joint (SJ) is across the BOP, function testing of the BOP shear rams will not be performed.LeaseG15607Area/BlockGC 743Rig ID50380Well NameDC103API Well Number608114055400
 APM ABANDONAlternate Compliance9/6/202430 CFR 250.737(d)(9) Gulf of Mexico02481BP Exploration & Production Inc.The BOP will be function tested before running the Spanner Joint / recovering the upper completion. When the Spanner Joint (SJ) is across the BOP, frequency-based function testing will be limited to the upper annular and the upper variable bore ram only. LeaseG15607Area/BlockGC 743Rig ID50380Well NameDC103API Well Number608114055400
 APM ABANDONAlternate Compliance9/6/202430 CFR 250.737(c) Gulf of Mexico02481BP Exploration & Production Inc.Digital BOP testing LeaseG15607Area/BlockGC 743Rig ID50380Well NameDC103API Well Number608114055400
 APM ABANDONAlternate Compliance9/6/202430 CFR 250.737(b)(2) Gulf of Mexico02481BP Exploration & Production Inc.To limit the blind shear ram pressure tests to the casing test pressure approved in the APD once installed. LeaseG15607Area/BlockGC 743Rig ID50380Well NameDC103API Well Number608114055400
 APM ABANDONAlternate Compliance9/6/202430 CFR 250.737(b)(2) Gulf of Mexico02481BP Exploration & Production Inc.Exclude the casing shear rams and test ram from periodically required BOP pressure test. Test gas bleed valves, upper kill line valves and upper choke line valves to annular test pressure.LeaseG15607Area/BlockGC 743Rig ID50380Well NameDC103API Well Number608114055400
 APM ABANDONAlternate Compliance9/6/202430 CFR 250.737(a)(2) Gulf of Mexico02481BP Exploration & Production Inc.When the Spanner Joint (SJ) is across the BOP, frequency-based pressure testing will be limited to the upper annular and the upper variable bore ram (VBR) only. The BOP will be tested prior to deploying the spanner joint and recovering the tubing.LeaseG15607Area/BlockGC 743Rig ID50380Well NameDC103API Well Number608114055400
 APM ABANDONAlternate Compliance9/6/202430 CFR 250.737(a)(2) Gulf of Mexico02481BP Exploration & Production Inc.When the completion tubing is across the BOP, pressure testing of the BOP (annular, shear rams, variable bore rams and choke and kill manifold) will not be performed. The BOP will be tested prior to deploying the spanner joint and recovering the tubing. LeaseG15607Area/BlockGC 743Rig ID50380Well NameDC103API Well Number608114055400
 FSS PermitTime Extension9/6/202430 CFR 250.520NGulf of Mexico02481BP Exploration & Production Inc.Time Extension for Casing Pressure MonitoringComplex ID1001Area CodeMCBlock Number 474Facility NameMC 474 - A(Na Kika)  
 FSS PermitAlternate Compliance9/6/202430 CFR 250.841(b)NGulf of Mexico02647Murphy Exploration & Production Company - USANon-welded piping connectorComplex ID1290Area CodeGCBlock Number 338Facility NameGC 338 - A(Front Runner)  
 New WellAlternate Compliance9/6/202430 CFR 250.420(b)(3) Gulf of Mexico00689Shell Offshore Inc.Barrier Profile LeaseG33166Area/BlockMC 612Rig ID50160Well NameDV001API Well Number608174150800
 New WellAlternate Compliance9/6/202430 CFR 250.1721(b) Gulf of Mexico00689Shell Offshore Inc.T&A Operations LeaseG33166Area/BlockMC 612Rig ID50160Well NameDV001API Well Number608174150800
 APM ABANDONAlternate Compliance9/6/202430 CFR 250.1716(b)(1) Gulf of Mexico00689Shell Offshore Inc.REQUEST TO LEAVE WELLHEAD IN PLACELeaseG07493Area/BlockGB 427Rig ID50160Well NameDC004API Well Number608074030900
 Measurement VerificationTime Extension9/6/202430 CFR 250.1202(f)(1)NGulf of Mexico02451GOM Shelf LLCMechanical-Displacement and Tank Prover CalibrationsFMP No. (Required)2017711260XExtension Month (MM/YYYY)08/2024Location (AA 0BBB P)SS 0182 CMeter DataWaterdraw  
Page 1 of 1224 (24477 items)Prev[1]234567122212231224Next v
Show filter builder dialogCreate Filter 

Download the Approvals Raw Data